|
|
TM 9-2320-364-34-1
Cable must be held when disconnected and
allowed to retract slowly by hand. Failure
to do so may result in equipment damage.
OPERATION TEST (CONT).
(20) Install cylinder rod on OSS side of
boom with retain pin and cotter pin.
(21) Install washer, spacer, and OSS
cable end with screw.
(22) Tighten two screws.
(23) Install other cylinder rod with
retaining pin and cotter pin.
(24) Tighten two screws.
(25) Install LH and RH cylinder
holddowns with two screws and
lockwashers each.
(25) Remove lifting device.
2-569
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |