|
|
TM 9-2320-364-34-1
OPERATION TEST
(1) Operate RH outrigger using
RH O/R JACK control lever on LH
side of truck while holding LH O/R
JACK control lever in UP position
(TM 9-2320-364-10).
(a) If RH outrigger does not operate
with LH O/R JACK control lever
in UP position, perform Steps (2)
through (4) below and go to
Step 6 of this Fault.
(b) If RH outrigger operates,
check valve in two valve bank
is faulty. Perform Steps (2)
through (4) below and repair two
valve bank (Para 16-28).
(2) Set crane POWER switch to OFF
position.
(3) Set hydraulic selector switch to OFF
position.
(4) Turn OFF ENGINE switch.
2-469
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |