|
|
TM 9-2320-363-20-2
4.
CONNECT BLUE AIR
LINE
TO
CYLINDER
BEHIND GLOVE BOX.
5.
CONNECT TWO FLEX HOSES TO DUCTS
BEHIND GLOVE BOX.
6.
INSERT COMPARTMENT (7) INTO DASH (8)
AND SECURE WITH THREE NUTS (9) AND
THREE SPRING WASHERS (10).
7.
INSERT TOP PANEL (11) TO COMPARTMENT
(7) AND SECURE WITH TWO SCREWS (12).
8.
POSITION COVER (13) ON DASH (8) AND
SECURE WITH SEVEN SCREWS (14).
9.
POSITION COVER (15) ON DASH (8) AND
SECURE WITH TWO SCREWS (16).
10.
POSITION COVER (17) ON DASH (8) AND
SECURE WITH THREE SCREWS (18).
11.
POSITION COVER (19) ON DASH (8) AND
SECURE WITH NINE SCREWS (20).
NOTE
Follow-on Maintenance:
Fill cooling system (page 4-141).
Connect batteries (page 2-29).
Check operation of heater/air conditioner (TM 9-2320-363-10).
Change 3 4-851.9
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |