|
|
TM9-2320-363-20-2
Clean and inspect all parts in accordance with Chapter 2.
1.
INSTALL ELBOW (12) IN TANK (2).
INSTALL NEW GASKET (11), FILLER NECK (10), FOUR NEW LOCK WASHERS (9), AND FOUR
2.
SCREWS (8) IN TANK (2).
INSTALL TANK (2), TWO WASHERS (6), AND TWO SCREWS (5) IN CAB (7).
3.
4.
CONNECT HOSE (4) TO TANK (2) AND TIGHTEN CLAMP (3).
FILL TANK (2) WITH COOLANT TO WITHIN 1/2 IN. FROM NECK. INSTALL CAP (1).
5.
4-829
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |