Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-363-20-2
POWER TAKE-OFF (PTO) SOLENOID VALVE REPLACEMENT (CONT)
INSTALLATION
1.
INSTALL PTO PRESSURE SWITCH (1) ON PTO SOLENOID VALVE (2).
2.
CONNECT TWO WIRES (3) AND INSTALL TWO SCREWS (4) ON PTO SOLENOID VALVE (2).
3.
CONNECT ELECTRICAL CONNECTOR (5).
4.
INSTALL TWO TIE WRAPS (6).
5.
CONNECT AIR HOSE (7) TO PTO (8) AND PTO SOLENOID VALVE (2).
6.
INSTALL PTO SOLENOID VALVE (2), CONNECT GROUND WIRE (9), AND INSTALL WASHER (10), NEW LOCK
WASHER (11), AND TWO SCREWS (12).
7.
CONNECT TWO AIR HOSES (13 ).
8.
CONNECT HOSE ASSEMBLY (14).
NOTE
Follow-on Maintenance:
Install transmission tunnel access cover (page 4-752 or 4-756.1)
Connect batteries (page 2-29).
4-770 Change 3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business