|
|
TM 9-2320-363-20-2
CTIS ELECTRONIC CONTROL UNIT (ECU) REPLACEMENT (CONT)
CLEANING/INSPECTION I
Clean and inspect all parts in accordance with Chapter 2.
INSTALLATION
1.
INSTALL ECU (1) ON SHIFT TOWER (2) WITH TWO NEW LOCK WASHERS (3) AND SCREWS (4).
2.
INSTALL WIRING HARNESS GROUND LEAD (5) WITH NEW LOCK WASHER (6) AND SCREW (7).
3.
CONNECT CTIS CAB WIRING HARNESS CONNECTOR P110 (8) TO ECU CONNECTOR (9).
NOTE
Follow-on Maintenance:
Install MCS control unit (TM 5-3805-264-14&P).
Connect batteries (page 2-29).
4-604.4 Change 3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |