|
|
TM9-2320-363-20-2
INSTALLATION
NOTE
P e r f o r m steps 1 thru 3 only if fittings have been removed from air tank.
1.
INSTALL TWO MOUNTING BRACKETS (1), TWO NEW LOCK WASHERS (2), AND TWO SCREWS
(3) ON AIR SUPPLY TANK (4).
WARNING
I
I
Make sure all air lines and fittings are clear of debris. Make sure excess
p i p e sealant compound does not enter air lines or fittings. Failure to do so
c o u l d result in equipment failure and/or injury to personnel.
Sealant compounds can burn easily, can give off harmful vapors, and are
harmful to skin and clothing. To avoid injury or death, keep away from open
f i r e and use in well-ventilated area. If sealant compound gets on skin or
c l o t h i n g , wash immediately with soap and water.
2.
COAT PIPE THREADS OF NEW DRAIN VALVE (5), NEW TEE (6), NEW CHECK VALVE (7), NEW
BUSHING (8), TWO NEW TEES (9), NEW SAFETY VALVE (10), AND FIVE NEW CONNECTORS
(11) WITH PIPE SEALANT COMPOUND.
3.
INSTALL DRAIN VALVE (5), TEE (6), CHECK VALVE (7), BUSHING (8), TWO TEES (9), SAFETY
VALVE (10), FIVE CONNECTORS (11), AND ELBOW (12) IN NEW AIR SUPPLY TANK (4).
4-481
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |