Click here to make tpub.com your Home Page

Page Title: INSTALLATION (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-363-20-2
DRIVELINE U-JOINT AND DUST CAP REPLACEMENT (CONT)
6.
INSTALL UNIVERSAL JOINT (6) IN FLANGE YOKE (7).
CAUTION
Be careful when installing bearing caps, or needle bearings may fall out and be
damaged or lost.
NOTE
Make sure bearing caps are seated against flange yoke.
7.
INSTALL TWO BEARING CAPS (8) ON EACH SIDE OF FLANGE YOKE (7) AND UNIVERSAL JOINT (6).
NOTE
M916A2, M917A1, and M917A1 w/MCS drivelines are not equipped with lockstraps.
8.
INSTALL LOCKSTRAPS (9) AND TWO SCREWS (10) ON BEARING CAPS (8). TIGHTEN SCREWS TO 28 LB-
FT (38 N.m) FOR M916A2, M917A1, AND M917A1 W/MCS. TIGHTEN SCREWS TO 33-38 LB-FT (44-52 N.m)
FOR M916A1.
9.
BEND TABS ON LOCKSTRAPS (9) AROUND SCREWS (10).
NOTE
Follow-on Maintenance:
Install drivelines (page 4-386 or 4-388).
Lubricate driveline and universal joint (Unit PMCS, TM 9-2320-363-20-1).
4-394 Change 3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business