Click here to make tpub.com your Home Page

Page Title: INSTALLATION (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-363-20-2
3.
POSITION HANDLE ASSEMBLY (7) ON SHIFT
TOWER (8).
4.
TO KEEP SHIFT TOWER RIGID, INSTALL TWO
TOP SCREWS (9) ON FRONT AND REAR OF
SHIFT TOWER (8).
NOTE
Perform steps 5 through 7 for M917A1 and M917A1 w/MCS.
5.
WITH HYDRAULIC CONTROL LEVER IN "DOWN" POSITION, INSTALL HYDRAULIC CONTROL CABLE PIVOT
PIN (10) IN BRACKET (11) AND SECURE WITH RETAINING PIN (12). REMOVE TAG FROM CABLE (13).
6.
INSTALL SPACER (14), CABLE (13), CLAMP (15), TWO SCREWS (16), TWO N W LOCK WASHERS (17), AND
E
TWO NUTS (18) TO BRACKET (19).
7.
PLACE HYDRAULIC CONTROL LEVER IN "N" POSITION.
Change 3 4-384.9

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business