| ||||||||||
| 
 
  | 
![]() TM 9-2320-363-20-2 
3. 
POSITION HANDLE ASSEMBLY (7) ON SHIFT 
TOWER (8). 
4. 
TO KEEP SHIFT TOWER RIGID, INSTALL TWO 
TOP SCREWS (9) ON FRONT AND REAR OF 
SHIFT TOWER (8). 
NOTE 
Perform steps 5 through 7 for M917A1 and M917A1 w/MCS. 
5. 
WITH HYDRAULIC CONTROL LEVER IN "DOWN" POSITION, INSTALL HYDRAULIC CONTROL CABLE PIVOT 
PIN (10) IN BRACKET (11) AND SECURE WITH RETAINING PIN (12). REMOVE TAG FROM CABLE (13). 
6. 
INSTALL SPACER (14), CABLE (13), CLAMP (15), TWO SCREWS (16), TWO N W LOCK WASHERS (17), AND 
E 
TWO NUTS (18) TO BRACKET (19). 
7. 
PLACE HYDRAULIC CONTROL LEVER IN "N" POSITION. 
Change 3 4-384.9 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |