|
|
TM 9-2320-363-20-2
7.
REMOVE SCREW (13), WASHER (14), AND BRACKET (11) FROM TRANSMISSION HOUSING (15).
8.
REMOVE SCREW (16), CLIP (17), MODULATOR (18), AND PACKING (19). DISCARD PACKING.
9.
REMOVE ELBOW (10) FROM MODULATOR (18).
CLEANING/INSPECTION
Clean and inspect all parts in accordance with Chapt er 2.
INSTALLATION
1.
COAT PIPE THREADS OF ELBOW (5), ELBOW (9), ELBOW (10), REDUCER (7), VENT EXHAUST (12), AND
SOLENOID VALVE (3) WITH PIPE SEALING COMPOUND.
2.
INSTALL ELBOW (10) TO MODULATOR (18).
3.
INSTALL NEW PACKING (19) AND MODULATOR (18) TO TRANSMISSION HOUSING (15). INSTALL CLIP (17)
AND SCREW (16). TORQUE SCREW TO 8-10 LB-FT. (11-14 N.m).
4.
INSTALL BRACKET (11) WITH WASHER (14) AND SCREW (13). TORQUE SCREW TO 40 LP-FT. (55 N.m)
5.
INSTALL VENT EXHAUST (12) TO SOLENOID VALVE (3).
6.
INSTALL SOLENOID VALVE (3) AND ELBOW (9) TO BRACKET (11).
7.
CONNECT HOSE (8) TO ELBOW (9) AND ELBOW (10).
8.
INSTALL REDUCER (7) AND PRESSURE REGULATOR (6) TO SOLENOID VALVE (3).
9.
INSTALL ELBOW (5) TO PRESSURE REGULATOR (6). CONNECT HOSE (4) TO ELBOW.
10.
CONNECT CONNECTOR (1) TO CONNECTOR (2) OF SOLENOID VALVE (3).
NOTE
Follow-on Maintenance:
Connect batteries (page 2-29).
Install transmission tunnel access cover (page 4-752 or 4-756.1).
Change 3 4-366.3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |