|
|
TM 9-2320-363-20-2
CLEANING/INSPECTION
Clean and inspect all parts in accordance with Chapter 2.
1.
INSTALL SHIFT CABLE ASSEMBLY (1) AND SHIFT TOWER (2).
2.
INSTALL FOUR NEW LOCK WASHERS (3) AND FOUR CAPSCREWS (4) ON SHIFT TOWER (2).
INSTALL CABLE (5) UNDER FLOOR MAT (6).
3.
CAREFULLY INSTALL CONNECTOR (7) UNDER FRAME (8).
4.
4-339
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |