|
|
TM 9-2320-363-20-2
INSTALLATION
NOTE
Installation of bracket is for M915A2 only.
1.
INSTALL TAILLIGHT (12), BRACKET (11), THREE NEW LOCK WASHERS (10), AND THREE NEW NUTS (9).
2.
INSTALL CLAMP (8), WASHER (7), SCREW (6), AND NEW LOCK NUT (5).
3.
INSTALL THREE WIRES (4) AND THREE NEW LOCK NUTS (3).
4.
INSTALL NEW COVER (2) AND FOUR NEW SCREWS (1).
NOTE
Follow-on Maintenance:
Lubricate taillight (Unit PMCS, TM 9-2320-363-20-1).
Connect batteries (page 2-29).
Change 3 4-221
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |