|
|
TM 9-2320-363-20-2
INSTALLATION
INSTALL THREE SCREWS (11) AND BLACKOUT MARKER (10) IN BRACKET (12).
1.
INSTALL WIRE (9) AND TWO NEW LOCK NUTS (8).
2.
FEED HARNESS (6) THRU FENDER AND INSTALL BLACKOUT MARKER LIGHT ASSEMBLY (7),
3.
GROMMET (5), CLAMP (4), THREE WASHERS (3), AND THREE NEW LOCK NUTS (2).
CONNECT TWO CONNECTORS (1).
4.
NOTE
Follow-on
Maintenance:
C o n n e c t batteries (page 2-29).
4-215
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |