| ||||||||||
| 
 
  | 
![]() TM9-2320-363-20-2 
CLEANING/INSPECTION 
Clean and inspect all park in accordance with Chapter 2. 
INSTALLATION 
1. 
COAT THREADS WITH SEALING COMPOUND AND INSTALL SECONDARY AIR PRESSURE 
SENDING UNIT (10). 
2. 
CONNECT TWO ELECTRICAL CONNECTORS (9 AND 8). 
3. 
INSTALL COVER (7) AND TWO SCREWS (6). 
4. 
INSTALL COVER (5), FIVE WASHERS (4), AND FIVE SCREWS (3). 
MOVE ENGINE CHECK SWITCH BRACKET (2) IN PLACE AND INSTALL TWO SCREWS (1). 
5. 
NOTE 
Follow-on 
Maintenance: 
C o n n e c t batteries (page 2-29). 
4-167 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |