TM 9-2320-360-34-2
29-2. SHIPPING AND STORAGE CONTAINERS, ENGINE, TRANSMISSION, AND TRANSFER CASE REPAIR.
This task covers:
a. Disassembly
c. Assembly
b. Cleaning/inspection
INITIAL SETUP
Equipment Conditions
Materials/Parts
Engine removed from container (para 3-4).
Compound, Sealing, Pipe Thread (Item 28,
Transmission removed from container
(para 7-3).
Lockwashers (60) (Item 122, Appendix F)
Transfer case removed from container
(para 8-2).
Tools and Special Tools
Tool Kit, Genl Mech (Item 202, Appendix E)
Wrench, Torque, 0-175 Lb-Ft (Item 236,
a. Disassembly
NOTE
All three containers are repaired in a
similar manner. Engine container is
shown throughout the task.
(1) Remove seal (1) from lower container (2).
29-2 Change 1
|