|
|
TM 9-2320-360-34-2
26-2. AIR COMPRESSOR REPAIR
This task covers:
a. Disassembly
c. Assembly
b. Cleaning/inspection
INITIAL SETUP
Equipment Conditions
Materials/Parts
Air compressor on clean work surface.
Oil, Lubricating (Item 46, Appendix B)
Plastigage (Item 50, Appendix B)
Solvent, Dry Cleaning (Item 54, Appendix B)
Tools and Special Tools
Tool Kit, Genl Mech (Item 202, Appendix E)
Parts Kit, Compressor (Item 209, Appendix F)
Caliper Set, Micrometer (Item 15, Appendix E)
Parts Kit (Item 202, Appendix F)
Compressor Unit, Air (Item 24, Appendix E)
Parts Kit (Item 203, Appendix F)
Compressor, Piston Ring (Item 19,
Parts Kit (Item 204, Appendix F)
Parts Kit (Item 205, Appendix F)
Gage Set, Telescoping (Item 56, Appendix E)
Parts Kit (Item 206, Appendix F)
Goggles, Industrial (Item 57, Appendix E)
Puller Kit, Mechanical, Gear and Brg
(Item 124, Appendix E)
Remover and Installer, Piston Ring (Item 135,
Wrench, Crow's Foot, 1/2 In. (Item 221,
Wrench, Crow's Foot, 9/16 In. (Item 218,
Wrench, Torque, 0-300 Lb-In. (Item 235,
Wrench, Torque, 0-175 Lb-Ft (Item 236,
a. Disassembly
(1) Loosen nut (1) on discharge manifold
assembly (2).
(2) Remove two screws (3), screws
(4), four
lockwashers (5), discharge
manifold
assembly (2), and two gaskets
(6) from
cylinder heads (7 and 8).
Discard
lockwashers and gaskets.
26-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |