|
|
TM 9-2320-360-34-2
e. Installation
NOTE
Teeth of first clutch planetary ring
gear and second clutch planetary
ring gear must be aligned. Failure to
comply will not allow rear carrier
assembly to be installed completely.
(1) Align teeth of first clutch planetary ring gear (1)
with teeth of second clutch planetary gear (2).
WARNING
Planetary is heavy. Do not lift rear
planetary assembly by ball bearing
on rear end. Bearing may come off
causing planetary to fall. Failure to
comply may result in personnel
injury or damage to equipment.
NOTE
Output shaft yoke must be turned
while lowering rear planetary carrier
assembly into first clutch planetary
ring gear. Failure to comply will not
allow rear carrier assembly to be
installed completely.
(2) Install lifting tool (3) on rear carrier
assembly (4) and install in transmission
housing (5) with suitable lifting device.
Remove lifting tool from rear carrier
assembly.
(3) Install center planetary ring gear (6) and
rear sun gear (7) in transmission housing
(5).
22-95
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |