|
|
TM 9-2320-360-34-2
Section III. MAINTENANCE PROCEDURES
22-3. TRANSMISSION TO TRANSMISSION STAND INSTALLATION/REMOVAL
This task covers
a. Installation
c.
Follow-On Maintenance
b. Removal
Initial Setup:
Equipment Conditions
Materials/Parts
Transmission removed from container
Compound, Sealing, Pipe Thread (Item 28,
(para 7-3).
Tags, Identification (Item 56, Appendix B)
Gasket (Item 25, Appendix F)
Tools and Special Tools
Tool Kit, Genl Mech (Item 202, Appendix E)
Kit, Mounting Parts (Item 145, Appendix F)
Fixture, Transmission Holding (Item 45,
Locknuts (7) (Item 86, Appendix F)
Lockwashers (4) (Item 122, Appendix F)
Sling Assemblies (2) (Item 160, Appendix E)
Screws (4) (Item 276, Appendix F)
Stand, Engine (Item 181, Appendix E)
Screws (4) (Item 277, Appendix F)
Wrench, Torque, 0-175 Lb-Ft (Item 236,
Personnel Required
Two
a.
Installation
(1) Remove breather (1) from reducer (2).
(2) Remove reducer (2) from transmission
(3).
NOTE
Tag and mark hoses before removal.
(3)
Remove hose no. 2672 (4) from adapter
(5).
(4)
Remove hose no. 2646 (6) from elbow
(7).
(5)
Remove hose no. 2851 (8) from screen
adapter (8).
NOTE
Transmission lockup solenoid and
hoses no. 2672, 2646, and 2851 are
removed with bracket.
(6)
Remove locknut (10), screw (11), and
bracket (12) from transmission (3).
Discard locknut.
(7)
Remove hose no. 2852 (13) from elbow
(14) and elbow (15).
22-3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |