|
| |
TM 9-2320-360-34-1
(33)
Install six ground wires no. 1435 (56) on
doghouse (55) with screw (57) and new
locknut (58).
NOTE
DDEC circuit breakers should be
positioned
in
locations
marked
during removal.
(34)
Install two DDEC circuit breakers (59) with
nuts (60) in ECB (54).
WARNING
Adhesive causes immediate bonding
on
contact
with
eyes,
skin,
or
clothing and also gives off harmful
vapors. Wear protective goggles and
use in well-ventilated area. If
adhesive gets in eyes, try to keep
eyes open, flush eyes with water for
15
minutes
and
get
immediate
medical attention.
NOTE
The four 2 in. (5 cm) screws are used
to retain the top doghouse insulation.
These screws must be placed in
locations marked during removal.
(35)
Coat threads of four screws (60.1) with
adhesive-sealant.
(35.1)
Install ECB (54) and two clips (61) on
doghouse (55) with eight screws (62), four
screws (60.1) and washers (60.2).
(36)
Install three harness connectors (63) in
sockets (64). Tighten three screws (65).
Change 2 11-37
|