Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Engine Preparation
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-360-34-1 3-5.  ENGINE REPLACEMENT (CONT) b. Engine Preparation (1) Deleted. (2) Remove    replacement    engine    (1)    from shipping container (para 3-4). WARNING Grade   8   screws   must   be   used   to support   engine.      Failure   to   comply may  result  In  engine  falling  causing injury or death to personnel. (3) Install  four  screws  (2)  to  flywheel  housing (3) on rear of replacement engine (1). (4) Place    replacement    engine    (1)    on    four suitable   stands   (4)   supported   at   engine flywheel   housing   screws   (2)   and   engine front mount (5). (5) Remove   lifting   device   from   replacement engine (1). (6) Remove  cover  (6)  from  inlet  and  outlet  of turbocharger   (7)   on   replacement   engine (1). (7) Remove    plugs,    covers,    and    tape    from fittings, hoses and openings. (8) Remove   pipe   plug   (8)   from   blower   inlet housing (9) on replacement engine (1). 3-48  Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business