| |
TM 9-2320-360-34-1
18-2. ARCTIC KIT INSTALLATION
This task covers:
a. Installation
b. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Materials/Parts
Batteries removed (TM 9-2320-360-20)
Compound, Sealing, Pipe Thread (Item 28,
Cooling system drained (TM 9-2320-360-20).
Appendix B)
Exhaust heat shield removed
Spray, Adhesive (Item 55, Appendix B)
(TM 9-2320-360-20).
Lockwashers (2) (Item 135, Appendix F)
Inner fenders removed (TM 9-2320-360-20).
Lockwasher (Item 127, Appendix F)
Tools and Special Tools
Tool Kit, Genl Mech (Item 202, Appendix E)
Wrench, Torque, 0-300 Lb-In. (Item 235,
Appendix E)
Wrench, Torque, 0-175 Lb-Ft (Item 236,
Appendix E)
a.
Installation
WARNING
·
Ensure engine is cool before
performing maintenance. Failure
to comply may result in serious
injury to personnel.
·
Adhesive can burn easily, can
give off harmful vapors, and is
harmful to skin and clothing. To
avoid injury or death, keep away
from open fire and use in well-
ventilated area. If adhesive gets
on
skin
or
clothing,
wash
immediately with soap and water.
(1)
Spray adhesive on inside of arctic battery
box cover (1). Install insulation panels (2
and 3).
18-2 Change 1
|