TM 9-2320-360-34-1
(51)
Install
electrical
connector
(116)
on
electrical connector (117) at ether start
base (118).
(52)
Install ether start line (119) on ether start
base (118).
(53)
Install air aspiration hose (120) and
cushion clip (121) on cab (3) with screw
(122) and new locknut (123).
(54)
Install ground strap (124) on cab mount
(8) with screw (125).
(55)
Coat area around screw (125) with
anticorrosion grease.
(56)
Install yoke (126) on top Steering shaft no.
1 (127) with screw (128) and new locknut
(129). Torque to 35 lb-ft (47 Nm).
16-31
|