Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-360-34-1 (11)    Install  two  new  lockwashers  (15)  and  nuts  (16) on studs (17).  Torque to 25 lb-ft (34 Nm). (12)    Install   two   new   lockwashers   (18)   and   screws (19)  on  air  spring  (13)  and  suspension  arm  (2). Torque to 50 lb-ft (68 Nm). (13) Install air line (20) on fitting (21). c.  Follow-On Maintenance (1)    Install  shock  absorber  (axle  no.    2  and  axle  no. 3 only) (TM 9-2320-360-20). (2)    Install wheel/tire (TM 9-2320-360-20). (3)    Start engine (TM 9-2320-360-10). (4)    Build  air  pressure  to  120-125  psi  (827-862  kPa) (TM 9-2320-360-10). (5)    Shut off engine (TM 9-2320-360-10). (6)    Check air springs for leaks. 15-23 (15-24 blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business