| |
TM 9-2320-360-20-1
WARNING
Jewelry can catch on equipment
and cause injury or short across
electrical circuit and cause severe
bums or electrical shock. Remove
rings, bracelets, watches,
necklaces, and any other jewelry
before working around HET
Tractor.
POWER MANIFOLD GROUND
CIRCUIT CONTINUITY TEST
(1)
Disconnect deflation valve connector
from power manifold.
(2)
Place positive (+) probe of multimeter in
deflation valve connector, position 1.
(3)
Place negative (-) probe of multimeter
on known good ground and check
multimeter for continuity.
(4)
Connect deflation valve connector to
power manifold
DEFLATION VALVE
SOLENOID COIL TEST
(1)
Remove connector from
deflation valve solenoid.
(2)
Place positive probe (+)
of multimeter on deflation
valve solenoid position 1.
(3)
Place negative probe (-)
of multimeter on deflation
valve solenoid position 2
and check multimeter for
continuity.
(4)
Install connector on
deflation valve solenoid.
(1)
Remove deflation valve
(para 7-68)
(2)
Inspect valve assembly for
broken springs, damaged
diaphragm, sticking, or any
other physical damage.
(3)
Install deflation valve
(para 7-68)
Change 1 2-833
|