Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Procedural Steps
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM  9-2320-356-BD Option   3: High-Pressure   Line   Repair   with   a   Cap. Procedural    Steps: 1. Disconnect   broken   hose   from   source. 2. Install   an   adapter   in   place   of   hose. 3. Coat   threads   of   adapter   with   sealing   compound. 4. Install   cap   on   adapter. 5. Record   the   BDAR   action   taken. When   the   mission   is   completed,   as   soon   as practicable,   repair   using   standard   maintenance   procedures. Option   4: High-Pressure   Line   Repair   Using   Flattened   Tube   End. Procedural   Steps: 1. Remove   broken   tube,   if   necessary. 2. Flatten   about   6   inches   of   tubing   near   break. 3. Fold   flattened   portion   of   tube   over   twice. 4. Install   repaired   tube   if   removed. 5. Record   the   BDAR   action   taken. When   the   mission   is   completed,   as   soon   as practicable,   repair   using   standard   maintenance   procedures. 3-33

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business