Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Procedural Steps
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM  9-2320-356-BD Option   2: Isolate    without    Plugs. Procedural    Steps: Option   1: Isolate   and   Plug. 1. Remove   hoses   4   and   5   from   swing   motor.   Refer   to   figure   below. 2. Plug   hoses   with   an   appropriate   fitting. 3. Record   the   BDAR   action   taken.      When   the   mission   is   completed,   as   soon   as practicable,   repair   using   standard   maintenance   procedures. 1. Remove   hoses   4   and   5   from   swing   motor   and   control   valve.   Refer   to   figure   above. 2. Remove   handle   from   control   valve. 3. Record   the   BDAR   action   taken. When   the   mission   is   completed,   as   soon   as practicable,   repair   using   standard   maintenance   procedures. 14-5

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business