Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section II. FRAME AND SUSPENSION
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM  9-2320-356-BD Section    II. FRAME AND SUSPENSION 13-3. BDAR  PROCEDURE  INDEX Para Front   and   rear   suspension   interchangeability    . . . . . . . . . . . . . . . . . . . . . . . . 13-4 Torque Rod Damage   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-5 Coil   Spring   Damage   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-6 Leaf   Spring   Damage   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-7 13-4. FRONT  AND  REAR  SUSPENSION  INTERCHANGEABILITY General    Information: Replacement   parts   may   not   be   available   through   normal   channels.   Replacements   can be   modified   if   obtained   from   other   vehicles   in   the   same   family   of   vehicles.   Most parts   will   be   usable   without   modification   or   improvised   mounting.   Suspension repairs   vary   with   vehicle   and   suspension   configuration   and   are   covered   in   more detail   in   specific   vehicle   TM’s. 13-5.  TORQUE  ROD  DAMAGE General    Information: Each   torque   rod   assembly   consists   of   a   torque   rod   and   two   ball   assemblies.   Torque rods   are   attached   to   each   rear   axle   and   transmit   driving   and   braking   forces   to   the frame. Limitations: o   Reduced   speed o    Degraded    mobility o   Reduced   vehicle   capacity Personnel/Time    Required: o   2   soldiers o   30   minutes Procedural    Steps: 1. Remove   locknuts. 2. Remove   damaged   torque   rod. 3. Chain   axle   to   the   frame. Materials/Tools: o    P r y    b a r o   6-   to   8-lb   hammer o   Chain o   Large   adjustable   wrench 4. Record   the   BDAR   action   taken. When   the   mission   is   completed,   as   soon   as practicable, repair   using   standard   maintenance   procedures. 13-3

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business