Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-312-24-1
RADIATOR ASSEMBLY, FAN SHROUD, AND CHARGE AIR COOLER
REPLACEMENT - CONTINUED
0142 00
INSTALLATION - CONTINUED
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during proce-
dure. Ensure that any lifting device used is in good condition and of suitable capacity. Keep clear of heavy
parts supported only by lifting device. Failure to follow this warning may result in injury or death to person-
nel
5.
Attach a sling to each side of charge air cooler (28). Attach other end of slings to overhead lifting device.
6.
Position two vibration dampers (30), four washers (31), and two bolts (32) to radiator (8).
CAUTION
Use caution when lifting radiator assembly not to damage electrical harnesses or other components.
7.
Carefully position radiator (8) assembly to vehicle.
8.
At each side of radiator (8), install vibration damper (30), washer (31), and nut (29) to underside of bolt (32).
9.
Remove overhead lifting device and slings.
28
32
8
31
30
29
31
30
0142 00-9

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business