Click here to make tpub.com your Home Page

Page Title: SWITCH INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-312-24-1
ENGINE OIL PRESSURE SWITCH AND SENDER REPLACEMENT - CONTINUED
0097 00
SWITCH INSTALLATION
1.
Install switch (5) to bushing (1) at tee (2).
NOTE
Replacement switch comes with new terminal screws.
2.
Connect two wires (3) to switch (5) with two terminal screws (4).
3.
Coat terminals of switch (5) with insulating varnish.
2
1
3
4
5
4.
Install transmission access cover (WP 0039 00).
5.
Place battery disconnect switch in ON position.
6.
Lower cab (TM 9-2320-312-10).
SENDER REMOVAL
NOTE
Remove and discard tiedown straps as necessary. Use new tiedown straps on installation.
Terminal is coated with insulating varnish and paint. Remove insulating varnish and paint to access ter-
minal.
1.
Remove nut and starwasher and disconnect wire (9) from sender (6).
2.
Remove sender (6) from bushing (7) at tee (8).
0097 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business