|
|
TM 9-2320-312-24-1
CIRCUIT BREAKERS AND RELAYS REPLACEMENT - CONTINUED
0095 00
CIRCUIT BREAKER INSTALLATION
1.
Connect three wires (8) of cab wiring harness to rear of circuit breaker (6).
2.
Position nut (10) and lockwasher (9) to circuit breaker (6).
3.
Install circuit breaker (6) into rear of instrument panel frame (7) and install ring (5).
4.
Install three instrument panels (1, 2, and 4) with 19 screws (3).
3
2
1
4
3
5.
Place battery disconnect switch in ON position.
RELAY REMOVAL
1.
Remove eight screws (12) to free right-side instrument panel (11) from instrument panel frame.
12
11
12
0095 00-3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |