|
|
TM 9-2320-312-24-1
STARTER REPLACEMENT - CONTINUED
0092 00
INSTALLATION - CONTINUED
2.
Connect white wire (16) to terminal (15) of starter solenoid (12) with new lockwasher (14) and nut (13).
3.
Connect red wire (17) and two cables (11) to terminal (8) with nut (9) and new lockwasher (8).
9,10
8
11
12
17
16
13,14,15
4.
Connect connector (6) to starter (7).
5.
Connect ground wire (1) and two ground cables (5) to terminal (2) of starter (7) with new lockwasher (4) and nut (3).
3,4
5
2
1
7
6
6.
Apply one or more coats of insulating varnish to starter and starter solenoid electrical connections.
7.
Connect battery cables (WP 0115 00).
END OF WORK PACKAGE
0092 00-4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |