Click here to make tpub.com your Home Page

Page Title: WET TANK INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-312-24-1
AIR RESERVOIR ASSEMBLIES REPLACEMENT - CONTINUED
0062 00
WET TANK INSTALLATION - CONTINUED
8.
On right side of tank (2), secure air hoses (19 and 23) to mounting strap screws (20) with two clamps (22) and nuts (21).
9.
On left side of tank (2), secure hydraulic hose (14) to welded studs (17) on mounting straps (18) with two clamps (16)
and nuts (15).
10.
At front of tank (2), connect air hose (12) to push-in straight fitting (13). Connect air hose (23) to push-in elbow fitting
(24).
13
12
14
24
15,16,17
23
2
18
22
19
21
20
11.
Secure drain valve cable pulls (11) to welded studs (9) on stowage compartment mounting bracket with two clamps (10)
and new locknuts (8).
8,9
10
11
0062 00-10

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business