Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-312-24-1
HEATER/AC CONTROLS REPLACEMENT - CONTINUED
0055 00
INSTALLATION - CONTINUED
4.
Connect cable (3) to shaft of valve (6) and secure with retainer nut (2).
5.
Secure cable (3) to valve (6) with clamp (4) and screw (5).
6.
Rotate knob (11) on instrument panel and verify cable (3) functions properly to open and close valve (6).
7.
Close heater/AC unit access door (1).
4
3
2
5
1
6
8.
Install lower-right instrument panel (9) with three screws (10).
9.
Install top-front instrument panel (7) with 14 screws (8).
8
7
10
9
10.
Place battery disconnect switch in ON position.
END OF WORK PACKAGE
0055 00-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business