Click here to make tpub.com your Home Page

Page Title: Table 1. Unit Preventive Maintenance Checks and Services (PMCS) for the M878A2 Yard Tractor cont'd
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-312-24-1
Table 1. Unit Preventive Maintenance Checks and Services (PMCS)
for the M878A2 Yard Tractor - Continued.
LOCATION
ITEM TO
EQUIPMENT NOT
ITEM
CHECK/
READY/AVAILABLE
NO.
INTERVAL
SERVICE
PROCEDURES
IF:
Inspect/leak test AC system (WP 0057 00).
Any leaks are evident.
29
Semiannual
Air
Conditioning
System
30
Semiannual
Air System,
a. Fully charge air system (TM 9-2320-312-
10).
Brakes
b. Listen for sounds of leaks in all air lines b. Any air leaks are evident.
and at valves and fittings.
c. If air leaks are suspected, with air system
fully pressurized, apply a solution of deter-
gent (Item 23, WP 0165 00) and water to
air lines, valves, and fittings. Tighten loose
connections. Replace damaged compo-
nents as required.
31
Semiannual
Air Dryer
Replace air dryer desiccant cartridge (Group
150 Commercial Service Manuals).
32
Semiannual
Front Axle
a. Inspect spring leaves for cracks and
breaks.
Suspension
b. Inspect U-bolts, spring caps, and spring
assembly attaching hardware for loose-
ness, cracks or other damage. Tighten any
loose component.
c. Check shock absorbers for looseness or
damage. Look for worn bushings and evi-
dence of fluid leakage from shock
absorber. If one shock absorber needs
replacing replace both at the same time
0009 00-16

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business