Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Clearance lights
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-304-14&P 5-250 Direct Support and General Support Maintenance (Cont) 5-43.    CONTAINER HANDLING UNIT (CHU) KIT INSTALLATION (CONT). (128)   Install rear light bar (172), two lockwashers (173), and two nuts (174). (129)   Connect wires to rear light bar (172). NOTE Both clearance lights install the same. Right side shown. (130)   Install clearance light (175), two lockwashers (176), and two nuts (177) to roller bracket assembly (67). (131)   Connect wires to clearance light (175). (132)   Connect batteries (TM 9-2320-364-20). (133)   Start engine (TM 9-2320-364-10). (134)   Fully extend hook arm (51) to take tension off pivot point (Para 2-9). WARNING Hook arm weighs 1,100 lbs. (499 kg). Attach suitable lifting device to prevent possible injury to personnel. Make sure hook arm is supported with lifting device during installation to prevent possible injury to personnel. (135)   Attach lifting device to hook arm (51). (136)   Make sure hook arm (51) is positioned fully to left side of truck. Use a pry bar if needed. Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business