| |
TM 9-2320-304-14&P
5-187
Direct Support and General Support Maintenance (Cont)
e. Installation.
NOTE
Install cable ties as required.
(1) Apply hydraulic oil to four preformed packings (1).
(2) Install four preformed packings (1) on left and right hook arm manifolds (2 and 3).
(3) Install left and right hook arm manifolds (2 and 3) on left and right cylinders (4 and 5) with
eight lockwashers (6) and screws (7).
WARNING
Adhesives, solvents, and sealing compounds can burn easily, can give off harmful vapors,
and are harmful to skin and clothing. To avoid injury or death, keep away from open fire
and use in a well-ventilated area. If adhesive, solvent, or sealing compound gets on skin or
clothing, wash immediately with soap and water.
(4) Apply sealing compound in countersunk hole around head of eight screws (7).
(5) Install hose 2881 (8) and hose 2891 (9) on two fittings (10) on left hook arm manifold (2).
(6) Install hose 2882 (11) and 2892 (12) on two fittings (13) on right hook arm manifold (3).
(7) Install two solenoid valve coils (14) on solenoid valves (15) with nuts (16).
(8) Apply sealing compound to two nuts (16).
|