| |
TM 9-2320-304-14&P
5-110
Direct Support and General Support Maintenance (Cont)
5-24. LOAD HANDLING SYSTEM (LHS) MAIN FRAME REPAIR (CONT).
(6) Remove connector (6) from junction
box (7).
(7) Remove cable ties (8) from main
harness (9).
WARNING
The LHS hydraulic system operates at oil
pressures up to 1,725 psi (11 894 kPa).
Never disconnect any hydraulic line or
fitting without first dropping pressure to
zero. Failure to comply may result in
serious injury or death to personnel.
NOTE
·
Tag and mark all hoses prior to
removal.
·
Cap and plug all hoses and fittings
after removal.
(8) Remove hoses 2881 (10), 2882 (11),
2891 (12), and 2892 (13) from main
frame bulkhead fittings (14).
WARNING
Main frame weighs 1,000 lbs. (454 kg).
Attach suitable lifting device prior to
removal to prevent possible injury to
personnel.
(9) Attach lifting device to main frame (5).
(10) With the aid of another soldier, use
lifting device and wooden blocks to
support main frame (5).
|