| |
TM 9-2320-304-14&P
4-234.40
Organizational Maintenance Instructions (Cont)
This task covers:
a. Removal
c. Installation
b. Cleaning/Inspection
d. Follow-on Maintenance
INITIAL SETUP
4-53.7 CONTAINER HANDLING UNIT (CHU) STOWAGE TRAY REPLACEMENT.
Special Tools
Tool Kit, General Mechanics: Automotive,
Item 33, Appendix B
Compressor Unit, Air, Item 2.2, Appendix B
Gloves, Chemical Oil Protective, Item 11,
Appendix B
Goggles, Industrial, Item 12, Appendix B
Gun, Air Blow, Item 12.1, Appendix B
Lifting Device, Minimum Capacity 400 lbs.
(181 kg)
Personnel Required
MOS 63S, Heavy wheel vehicle mechanic (2)
Equipment Condition
TM or Para
Condition Description
TM 9-2320-279-10 Engine OFF
TM 9-2320-279-10 Wheels chocked
Para 2-10.11
Rail transport corner ISO
locks removed
Para 2-10.1
Container guides
removed
References
None
Models
M1120
Test Equipment
None
Special Environmental Conditions
None
General Safety Instructions
None
Supplies
Locknut (4), Item 1, Appendix K
Change 1
|