| |
TM 9-2320-304-14&P
4-187
Organizational Maintenance Instructions (Cont)
b. Installation.
(1) Install relay (1) on relay socket (2).
(2) Install main junction box cover (3) on
junction box (4) with four captive
screws (5).
(3) Install LHS control box cover (6) on
bracket (7) with four screws (8) and
lockwashers (9).
c. Follow-on Maintenance.
(1) Connect batteries (TM 9-2320-279-20).
(2) Remove wheel chocks
(TM 9-2320-279-10).
END OF TASK
|