| |
TM 9-2320-304-14&P
4-170.8
Organizational Maintenance Instructions (Cont)
4-34.2 CONTAINER HANDLING UNIT (CHU) CONTROL BOX WIRING REPLACEMENT
(CONT).
b. Installation.
NOTE
Connect only wires required to complete task. Refer to Table 4-4.1, CHU Control Box
Wiring, for specific control box wiring replacement.
(1)
Follow Table 4-4.1 and removal illustration to connect wires.
(2)
Install connectors MC185A (1), MC82B (2), and MC82A (3) to control box (4) using three
nuts (5).
c. Follow-on Maintenance.
(1)
Install CHU control box assembly (Para 4-34.1).
(2)
Connect batteries (TM 9-2320-279-20).
(3)
Remove wheel chocks (TM 9-2320-279-10).
END OF TASK
Change 1
|