| |
TM 9-2320-304-14&P
2-7
Operating Instructions (Cont)
Table 2-1. Operators Preventive Maintenance Checks and Services (Before)
Location
Item
No.
Interval
Item to Check/
Service
Procedure
Not Fully
Mission
Capable if:
WARNING
Check for overhead power lines or other obstructions before attempting LHS
operation. LHS reaches a system height of 17 ft. 2 in. (5.23 m) with ISO container.
Serious injury or death could result from contact with electrical power lines.
1
Before
Load Handling System
(LHS) Controls
(a)
Check for proper operation of hydraulic
selector switch (1) and joystick control (2).
Verify by putting PTO ENGAGE switch (3)
in ON position. Make sure indicator light (4)
comes on and place hydraulic selector
switch (1) in the AUTO position.
LHS will not
operate.
(b)
Pull joystick (2) to rear to raise LHS
approximately one to two ft. (0.305 to
0.610 m). LHS indicator (5) will light green
and LHS NO TRANSIT indicator (6) will
light red. LHS OVER LOAD indicator (7)
may light yellow if system is overloaded.
(c)
Push joystick (2) forward and lower to
transport position. LHS NO TRANSIT
indicator (6) will go out.
(d)
Turn hydraulic selector switch (1) to
OFF. LHS indicator (5) will go out.
(e)
Put PTO ENGAGE switch (3) in OFF
position. Make sure indicator light (4) goes
off.
(f)
Shut OFF engine (TM 9-2320-279-10).
|