|
|
TM 9-2320-303-24-2
TRANSMISSION OVERHAUL - CONTINUED
0248 00
ASSEMBLY - CONTINUED
Installation of Control Valve Module
1.
Position transmission in a vertical position, torque converter up.
2.
Install two guide pins in two main housing bolt holes. Install new control module gasket (32) over guide pins.
3.
Lubricate wiring harness feed-through hole with petrolatum.
4.
With assistance, guide control module (33) onto main housing (24) and pass feed-through harness (28) through feed-
through hole in the main housing.
5.
Align control module (33) bolt holes with guide pins. Ensure feed-through harness standoff is aligned with hole in main
housing (24).
6.
Lower control module (33) over guide pins until it seats against main housing (24) and feed-through harness standoff
seats against tapered hole in main housing.
7.
Remove guide pins and install 43 bolts (34). Evenly tighten bolts to 38-45 lb-ft (51-61 Nm).
8.
Install retaining nut (27) and lockwasher (28) to secure feed-through harness (29) to mounting bracket (26).
9.
Install retaining nut (30) and lockwasher (31) to secure feed-through harness (29) to transmission housing (24).
27,28
26
24
29
30,31
32
33
34
402-598
0248 00-56
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |