Click here to make tpub.com your Home Page

Page Title: ASSEMBLY - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-303-24-2
TRANSMISSION OVERHAUL - CONTINUED
0248 00
ASSEMBLY - CONTINUED
49
50
46
24
47
24
48
403-604
403-603
Installation of P1/P2 Planetary Modules
1.
Install P1 planetary module (45), consisting of P1 carrier and P2 ring gear.
2.
Mesh P1 pinion gears with P1 ring gear inside C3/C4 clutch assembly.
3.
Install P2 planetary module (41), consisting of P2 carrier and P3 ring gear.
4.
Mesh P2 pinion gears with P2 ring gear during installation.
Installation of C5 Clutch Pack
1.
Install C5 clutch pack (42) in main housing (24). Clutch pack consists of nine steel reaction plates (44) and eight friction
plates (43), stacked alternately, starting with a steel reaction plate.
2.
Stack all plates so that plate cone faces same direction. Steel plates mesh with main housing (24) and reaction plates
mesh with P3 ring gear.
24
41
24
42
45
43
44
402-601
402-602
0248 00-49

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business