|
|
TM 9-2320-303-24-1
AIR CONDITIONER COMPRESSOR MAGNETIC CLUTCH REPLACEMENT - CONTINUED
0217 00
REMOVAL - CONTINUED
3.
Tighten puller kit bolt to remove pulley rotor assembly (3) from compressor shaft (8). Remove woodruff key (6) from
compressor shaft. Retain woodruff key for later use.
4.
Remove field coil electrical lead (5).
5.
Remove four bolts (4) and field coil assembly (9) from compressor (7).
7
7
6
5
4
3
8
9
8
2
1
9
INSTALLATION
1.
Install field coil assembly (9) on compressor (7) with four bolts (4). Tighten bolts to 96 lb-in (1084 Ncm).
2.
Install woodruff key (6) and pulley rotor assembly (3) on compressor shaft (8) taking care to properly align and seat
shaft and hub keyways.
3.
Install washer (2) and retaining bolt (1) on pulley rotor assembly (3). Using clutch holding tool to keep pulley from
rotating, tighten retaining bolt to 20 lb-ft (27 Nm).
4.
Turn pulley rotor assembly (3) by hand to ensure that assembly moves freely without interference with field coil assem-
bly (9).
5.
Install field coil electrical lead (5).
6.
Verify clutch engages when air conditioner switch is in ON position (TM 9-2320-303-10).
7.
Install alternator belt (WP 0059 00).
8.
Start vehicle and check operation of air conditioner (TM 9-2320-303-10).
END OF WORK PACKAGE
0217 00-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |