|
|
TM 9-2320-303-24-1
AIR PRESSURE SENDING UNITS (PRIMARY/SECONDARY) REPLACEMENT - CONTINUED
0088 00
INSTALLATION - CONTINUED
NOTE
Perform steps 1 and 2 to install secondary air pressure sending unit.
1.
Lightly coat threads of secondary air pressure sending unit (7) with pipe sealing compound. Install sending unit on cab
air junction block (14).
2.
Connect two electrical connectors (8 and 9) to secondary air pressure sending unit (7).
NOTE
Perform steps 3 through 6 to install primary air pressure sending unit.
3.
Lightly coat threads of primary air pressure sending unit (13) with pipe sealing compound. Install sending unit on air
junction block (14).
4.
Connect two electrical connectors (11 and 12) to primary air pressure sending unit (13).
5.
Lightly coat threads of two fittings (15) with pipe sealing compound. Install fittings on cab air junction block (14).
6.
Install two air lines (10) on fittings (15).
7.
If removed, install cab air junction block (WP 0195 00).
8.
Install cover (6) with five washers (5) and screws (4).
9.
Install cover (3) with three washers (2) and screws (1).
10.
Check air system for leaks (TM 9-2320-303-10).
1,2
3
4,5
6
END OF WORK PACKAGE
0088 00-3/(0088 00-4 blank)
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |