Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-303-24-1
RIGHT PANEL GAGES AND LAMPS REPLACEMENT - CONTINUED
0064 00
INSTALLATION
1.
Install four lamps (10) in lamp holders (11). Turn lamps to right to lock in place.
2.
Install air cleaner restriction indicator gage (4) on panel (1) with two screws (5).
3.
Install fuel level gage (8) and transmission oil temperature gage (6) on panel (1) with two brackets (12), four washers
(13), and nuts (14).
4.
Install two air pressure gages (3 and 7) on panel (1) with two brackets (21), ground wire (20), and four new locknuts
(19).
5.
Install four lamp holders (11) on fuel level gage (8), transmission oil temperature gage (6), and two air pressure gages (3
and 7).
6.
Install two tubes (9) to air pressure gages (3 and 7). Connect tube (18) to air cleaner restriction indicator gage (4).
7.
Install two connectors (15) on fuel level gage (8) and transmission oil temperature gage (6).
8.
Install connector (16) on cab wiring harness connector (17).
9.
Install panel (1) on dashboard with four screws (2).
10.
Start vehicle (TM 9-2320-303-10). Check gages and lights for proper operation and check for air system leaks.
END OF WORK PACKAGE
0064 00-3/(0064 00-4 blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business