|
|
TM 9-2320-303-24-1
ETHER STARTING AID REPLACEMENT - CONTINUED
0039 00
REMOVAL
1.
Remove two wing nuts (6), six lockwashers (3), clamp (5), two studs (4), and four nuts (2). Discard lockwashers.
2.
Disconnect lug (16), boot (13), electrical contact (14), and connector (15).
3.
Remove tiedown straps (11).
4.
Remove tube (9) from adapter (8) on valve and atomizer (12) on manifold. Remove clamp (10) from tube.
5.
Remove atomizer (12) from manifold.
6.
Remove adapter (8) from valve (17).
7.
Loosen two screws (18) and remove valve (17) from bracket (part of valve).
8.
Remove two screws (20), four lockwashers (21), two locknuts (22), and bracket (part of valve) from bracket (23). Dis-
card lockwashers and locknuts.
9.
Remove two screws (7), two spacers (24), two washers (1), two locknuts (25), and bracket (23). Discard locknuts.
INSTALLATION
1.
Position bracket (23) and install two screws (7), two spacers (24), two washers (1), and two new locknuts (25).
2.
Position bracket (part of valve) on bracket (23) and install two screws (20), four new lockwashers (21), and two new
locknuts (22).
3.
Install valve (17) on bracket (part of valve) and tighten two screws (18).
4.
Install adapter (8) on valve (17).
5.
Install atomizer (12) on manifold.
6.
Install clamp (10) on tube (9) and install tube on adapter (8) and atomizer (12)
7.
Install tiedown straps (11) in same position as removal.
8.
Connect lug (16), boot (13), electrical contact (14), and connector (15).
9.
Install two wing nuts (6), six new lockwashers (3), clamp (5), two studs (4), and four nuts (2).
0039 00-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |