Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-302-20-2
FRONT HUB, DRUM, WHEEL BEARINGS, AND SEAL REPLACEMENT (M915A3) - CONTINUED
0207 00
INSTALLATION - CONTINUED
13.
Install lock ring (13) and new lockwasher (20) on axle spindle (10).
14.
Install jamnut (14) on axle spindle (10). Tighten jamnut to 100-150 lb-ft (136-203 Nm).
15.
Bend tab of lockwasher (20) over a flat on jamnut (14).
ADJUSTMENT (END PLAY)
1.
Attach dial indicator magnetic base to hub (5).
2.
Adjust dial indicator so plunger is against spindle (10) end.
3.
Position dial indicator parallel to axis of spindle (10).
4.
Grasp hub (5) at 3 and 9 o'clock positions.
5.
Push and pull hub (5) in and out while rotating hub approximately 45 degrees.
6.
Note end play while rotating hub (5) until dial indicator tip is in same position before rotation began.
7.
Acceptable end play is .001-.005 inches.
8.
If end play is not within tolerance, loosen jamnut (14) and either back off or tighten adjusting nut (21) as required.
9.
Repeat steps 1 through 7 until acceptable end play is achieved.
10.
Install hub cap (19) and new gasket (15) on hub (5) and with six screws (17) and new lockwashers (16). Tighten screws
to 180 lb-in (20 Nm).
11.
Remove hub filler cap (18) and add gear lubricating oil to level of filler hole. Wait 5 minutes and add more oil, as
needed.
12.
Install hub filler cap (18).
13.
Install brake drum (11) over hub (5).
10
5
21
20
11
19
18
16
13
14
17
15
0207 00-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business