Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-302-20-2
AIR PRESSURE SENDING UNITS (PRIMARY/SECONDARY) REPLACEMENT - CONTINUED
0121 00
INSTALLATION - CONTINUED
NOTE
Perform steps 1 and 2 to install secondary air pressure sending unit.
1.
Lightly coat threads of secondary air pressure sending unit (7) with pipe sealing compound. Install sending unit on cab
air junction block (14).
2.
Connect two electrical connectors (8 and 9) to secondary air pressure sending unit (7).
NOTE
Perform steps 3 through 6 to install primary air pressure sending unit.
3.
Lightly coat threads of primary air pressure sending unit (13) with pipe sealing compound. Install sending unit on air
junction block (14).
4.
Connect two electrical connectors (11 and 12) to primary air pressure sending unit (13).
5.
Lightly coat threads of two fittings (15) with pipe sealing compound. Install fittings on cab air junction block (14).
6.
Install two air lines (10) on fittings (15).
7.
If removed, install cab air junction block (WP 0191 00).
8.
Install cover (6) with five washers (5) and screws (4).
9.
Install cover (3) with three washers (2) and screws (1).
1,2
3
4,5
6
END OF WORK PACKAGE
0121 00-3/(-4 Blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business