Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-302-20-2
VOLTAGE REGULATOR REPLACEMENT (M915A3 NEW MODEL,
M916A3, M917A2) - CONTINUED
0070 00
INSTALLATION
1.
Position voltage regulator (8) on alternator pad with red lead (13) down.
2.
Install four screws (7).
3.
On top threaded stud (1), install black cable lead (6), nut (5), black voltage regulator cable lead (4), washer (3), and nut
(2).
4.
On bottom threaded stud (16), install red cable lead (13), washer (12), nut (11), red voltage regulator cable lead (10),
washer (15), and nut (16).
4
2,3
5,6
1
7
8
9
10
16
14,15
11,12,13
5.
Start vehicle and check that voltmeter is in green band (TM 9-2320-302-10).
END OF WORK PACKAGE
0070 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business